Agriculture

Configuration ‘1C: Agriculture’ consists of the standard module of the programme and is supplemented with the programme objects that allow you to keep records and perform analysis in the section of agriculture.

Description of ‘1C: Agriculture’ configuration

Documents

Entering planned cost price
Designed for entering planned cost price of products, which is then automatically filled in the document ‘Receipt of products’ for the selected products.

Receipt of products
Designed for entering operations on receipt of products at the planned cost price.

Closing of accounts 811.10 and 215.3 to account 216.4
Designed to close the costs accumulated on accounts 811.1 and 215.3 to account 216.4 at the end of the reporting period.

Closing of accounts 813, 812 to account 811.2
Designed to close costs accumulated in accounts 813 and 812 to account 811.2 at the end of the accounting period.

Calculation
Designed to bring the planned cost of production to the actual cost of production and charge the calculation difference to account 711.1.

Reports

Production report
Shows the consumption of materials for the production of agricultural products

Types of work 
To analyse work by type.

Manual works by crops
To analyse manual works.

Cumulative by cost
Analyses cost of production by cost items, crops, fields.

Receipt of production
Summary report on production for the period.

Harvesting
Summary report by types of products, cost items and types of work.